What We Do

Services

Every deck job we quote, from a full build to a repair on someone else's work.

HomeServices

Everything we take on

Every job below is one we do ourselves across Endicott.

Deck Installation

We build new decks from the footings up, sized to the house and yard instead of a standard rectangle. Footings go below the frost line, and joists are sized off a span table for the actual load. Most single-level decks take one to two weeks depending on size and weather.

Custom Deck Design

Multi-level decks, built-in benches, pergolas and stairs placed where you actually want them, not where a stock plan puts them. We draw it out and price it before any lumber gets ordered.

Deck Repair

Soft boards, wobbly railings and a deck that bounces when you walk across it usually trace back to one bad joist or a ledger board pulling away from the house. We replace what's failed and leave the rest alone if it's still sound. Sometimes that's a couple of boards, sometimes it's the whole frame.

Deck Staining & Sealing

Sun and snow gray and crack untreated wood faster than most people expect, usually within two to three years. We pressure wash, let the deck dry, then stain or seal it so the wood sheds water instead of soaking it up. Composite decking skips this step, pressure-treated and cedar don't.

Composite Decking Installation

Composite boards like Trex or TimberTech skip the yearly staining, but they still need proper joist spacing underneath, usually tighter than for wood, and they expand and contract with heat more than lumber does. We frame for that so the boards don't buckle in August.

Deck Railing Installation

Baluster spacing has to stay under 4 inches under most local codes, and the top rail has to hold up to a real push, not just look sturdy. We build railings to pass inspection and to actually take weight.

Deck Framing & Joist Repair

This is the part nobody sees until it fails: rusted joist hangers, a beam undersized for its span, a ledger bolted into siding with no flashing behind it. We open up the decking, fix the frame, and put it back together right.

Deck Resurfacing

If the frame underneath is still solid, we can strip off old decking and railings and rebuild the surface without touching the structure. This cuts the cost compared to a full rebuild, as long as the joists pass inspection first.

Deck Demolition & Removal

Old decks come down board by board or all at once, whichever the site allows, and we haul the debris off. Sometimes this is step one before a new deck goes in the same footprint, sometimes the yard just needs the eyesore gone.

Screened-In Porch Construction

Same framing principles as a deck, with a roof, screens and a floor system built to handle rain instead of just weight. A good option if you want an outdoor space that isn't full of mosquitoes by July.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Endicott, NY

We travel throughout the Southern Tier for deck installation and repair.

Endicott, NY
Binghamton, NY
Ithaca, NY
Elmira, NY
Vestal, NY
Johnson City, NY
Kirkwood, NY
Waverly, NY
Owego, NY
Apalachin, NY
Windsor, NY
Common Questions

Things worth asking

Questions that come up once a deck project is actually underway.

Do I need a permit to build a deck?
Most towns in the Endicott area require a building permit for any deck attached to the house or more than 30 inches above grade, and an inspector typically checks the footings before decking goes down. Permit paperwork and inspection scheduling are handled as part of the deck installation process.
How long does it take to build a deck?
A standard single-level deck usually takes one to two weeks from footings to finished railings, depending on size and weather. Multi-level or custom designs with built-in features can take three to four weeks.
Can a deck be built to a specific budget?
Decking material is the biggest lever on price, with pressure-treated lumber costing less upfront than composite or cedar, and railing style and deck size the next biggest factors. A written quote lays out where the money goes so trade-offs can be made before ordering material.
Is there a guarantee on deck construction work?
Workmanship is guaranteed against framing and installation defects, and materials like lumber and composite decking carry their own manufacturer warranties. Details on what's covered and for how long are included in the written quote.
Who will I be dealing with during the project?
The same crew that gives the estimate and builds the deck stays on the job through completion, rather than handing it off between different work groups. Questions during the project go straight to the people doing the work.
What decking materials are available?
Pressure-treated pine, cedar and composite brands like Trex and TimberTech are all used depending on budget and maintenance preference, with pressure-treated the cheapest but needing regular staining and composite costing more upfront but skipping that upkeep. Railing material can be matched or mixed, wood posts with composite balusters being a common combination.
Can I still use my yard and house during construction?
The house stays fully livable during deck construction since the work is exterior and doesn't touch interior systems, though the yard near the build site will have material staged in it for the duration. Access to the old deck, if one is being replaced, is lost once demolition starts.
How should I prepare my yard before deck construction starts?
Clearing furniture, grills and potted plants off the existing deck or the build area ahead of time saves setup time on day one. Marking the location of any sprinkler lines, buried cable or underground pet fencing near the footing sites is also worth doing before digging starts.
What happens if you find rot or a bad footing mid-project?
If a support post, ledger board or existing footing turns out to be rotted or undersized once opened up, the issue gets flagged before continuing rather than built over. Any added cost or time from that discovery is discussed and approved before work proceeds.
How do I maintain a deck after it's built?
Pressure-treated and cedar decks need washing and restaining roughly every two to three years to keep water from soaking into the wood. Composite decking just needs an occasional wash with soap and water, but hardware and railings on any deck are worth checking yearly for loose screws or rust.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (607) 399-3497